[Emerald] BIM and lean construction in prefabricated housing construction in China

哎那个啥 Post time 2024-4-30 11:15:54 | Show all posts |Read mode
Reward10points

发表期刊:International Journal of Lean Six Sigma

作者:Yanqing Fang;尚高;江燕武;李

淑泉 发布日期:2023-11-7

DOI:10.1108/ijlss-03-2022-0059

PDF链接:https://www.emerald.com/insight/content/doi/10.1108/IJLSS-03-2022-0059/full/xml

文章链接:http://dx.doi.org/10.1108/ijlss-03-2022-0059



备注:
文章来源:Emerald

Best Answer

Please adopt

View Full Content

Reply

Use magic Donate Report

All Reply1 Show all posts
green69 Post time 2024-4-30 11:15:55 | Show all posts

This post has been completed

Completed attachments will be deleted within 24 hours.
Reply

Use magic Donate Report

Junior Member
  • post

  • reply

  • points

    10

Latest Reply

Return to the list